Standard Powder Coating Ovens and Booths
Technical & Commercial proposal
Type: Filter type Application systems
Width: 0,9 – 5,5 m
Height: 2 – 2,25 m
Depth: 1,1 – 2,5 m
Capacity: 1500 – 2×5000 m3/h or 0,55 – 8 kW
Quantity of filters: 1 – 10
Type: Box Type Powder Curing Ovens
Width: 1 – 1,5 m
Height: 1 – 1,8 m
Length: 1 – 7 m
Heating: Electrical, Natural Gas or LPG, Diesel
Termoblock Length: 0,5 – 1,1 m
Capacity: 9 – 84 kW or 60 000 – 120 000 kcal/h
Type: Double Door Powder Curing Ovens
Width: 1,5 m
Height: 1,8 m
Length: 3 – 7 m
Heating: Electrical, Natural Gas or LPG, Diesel
Termoblock Length: 1,8 m
Capacity: 36 – 104 kW or 60 000 – 120 000 kcal/h
Type: Curing Ovens with Axial Conveyor
Width: 1,5 m
Height: 1,7 m
Length: 3 – 7 m
Heating: Electrical, Natural Gas or LPG, Diesel
Termoblock Length: 0,8 – 1,1 m
Conveyor Length: 10,73 – 22,65 m
Capacity: 36 – 104 kW or 60 000 – 150 000 kcal/h
Type: Axial Conveyor systems
Width: 2 m
Height: 2,3 m
Length: 10,2 – 22,2 m
Adjustable speed: 1 – 5 m/min
Capacity: 0,55 – 0,75 kW
Interval between hooks: 662 mm
Equipment: Dip pretreatment line, Cyclone powder coating booth.
Equipment: Metal Powder Coating Booth, Powder Coating Conveyor FreeType, Powder Coating Curing Ovens Tunnel Type.
190+ Countries
250+
Since 2003
2000000+
Services
How We Work with Customers
Step 1. Request
Send an application in a convenient way:
- email: [email protected]
- Viber, WhatsApp, Telegram +971 58 5931811.
Step 2. Project Requirements
We will send you a questionnaire.
Fill out the questionnaire. Provide us with the required parameters and equipment specifications.
Submit your project requirements to us.
Step 3. Technical & Commercial Proposal
Our engineers will develop a Technical & Commercial proposal within 2-3 days, depending on the complexity of the project. It’s absolutely free.
Step 4. Contract
We sign a contract with the client. We agree on terms and responsibilities: production and delivery, price, installation of equipment.
Step 5. Production
The production period is 45 – 90 days, depending on the complexity of the project. We start production after 60% advance payment.
Step 6. Delivery
The customer pays 40% of the payment before the shipment. We deliver the equipment to the customer’s facility.
Step 7. Installation and education
We carry out free installation, test run of equipment and training of customer’s employees.
Step 8. Warranty
Equipment (except for electrical motors, worn out and corroded parts) has a 1-year warranty against defective products and materials.
Step 9. Service
We provide service after the warranty period. We supply components for lines and carry out repairs for an extra price.